TRRP
  • Home
  • CALENDAR
    • CALENDAR
    • Trinity Management Council (TMC)
    • Trinity Adaptive Management Working Group (TAMWG)
    • Inter-Disciplinary Team (IDT)
    • Design Team
    • Fish Workgroup
    • Flow / Temperature Workgroup
    • Gravel / Physical Workgroups
    • Watershed Workgroup
    • Riparian and Aquatic Ecology Workgroup
    • Other Events
  • WHO WE ARE
    • Background
      • Fish of the Trinity River
      • Record of Decision (ROD)
    • Program Structure
      • Trinity Management Council (TMC)
      • Trinity River Adaptive Management Working Group (TAMWG)
      • Scientific Advisory Board (SAB)
      • TRRP Workgroups
    • Adaptive Management
      • Synthesis Reports
    • Foundational Documents
  • RESTORATION
    • Variable Flows
      • Current Restoration Flow Release Schedule
      • Flow Volume Summary
      • Typical Releases
      • Flow Release Notifications
      • River Conditions
      • Lake Conditions
      • Flow FAQ
    • Channel Rehabilitation
      • Concepts
      • Current Site: Dutch Creek (2020 Construction)
      • Channel Rehabilitation Site: Chapman Ranch Phase B (Proposed 2021 Site)
      • Channel Rehabilitation Sites
      • Environmental Compliance
      • Channel Rehabilitation FAQ
    • Watershed Activities
      • Watershed Activity Sites
    • Gravel Augmentation
    • Science and Adaptive Management
      • Fish Monitoring
        • Adult Salmonids
        • Juvenile Salmonids
        • Juvenile Rearing Habitat
      • Physical Sciences
      • Riparian Ecology
        • Vegetation and Wildlife
      • Water Temperature
      • Trinity River Ecology FAQ
      • Glossary of Important Terms
    • Restoration Action Database (RAD)
  • DATAPORT
    • Map
      • General Map
      • 1944 Aerial Photos
      • 1960 Aerial Photos
      • 2001 Aerial Photos
      • 2019 Aerial Photos
      • Analytical Data
      • Channel Dynamics (example)
      • TRRP Channel Rehab Designs
      • TRRP Channel Rehab As-Builts
      • Trinity River Watersheds
    • Document and Data Library
    • Synthesis Reports
    • RiverView Launch
    • Restoration Action Database (RAD)
    • Flow Volume Summary
    • Dashboard
    • UAS Flights
  • CONTACT US
  • Menu

TRRP Workgroups

The TRRP has a number of collaborative work groups for addressing technical issues. Work group meetings are open to the public and are posted on the TRRP calendar, viewable on theĀ Calendar page. Agendas and summaries are available through each workgroup’s page:

  • Design Team
  • Fish Workgroup
  • Flow Workgroup
  • Gravel Augmentation/Physical Workgroup
  • Inter-Disciplinary Team (IDT)
  • Watershed Workgroup
  • Wildlife and Riparian Workgroup

The TRRP website follows the intent of the DOI disclaimer.

A SiteOrigin Theme