Channel Rehabilitation

Reason for Action

Lowden Pre-construction Riparian vegetation at Lowden site prior to rehabilitation. The dense canopies look beautiful to people, but armor the banks, reducing floodplains and juvenile salmon habitats.

Regulated flows from the Trinity River Division dams have affected the channel in numerous ways (see also Flow Overview). The regulated flows lacked the force to carve the banks and maintain channel diversity. Steady low flows enabled vegetation to grow thickly on low banks of the river. Productive floodplain habitats became inaccessible to fish. Coarse gravel and large woody debris could no longer flow from the watershed past the dams and into the lower river.

Gold Dredger Adding to this list of problems, a century of large scale dredge and hydraulic mining preceding the dams created very unnatural channel forms. Floods in the early- to mid-1900’s reworked some of the tailings piles, but flow regulation began long before the river could fully recover a natural form. Steep banks and high terraces remain common features on the river today.

Higher flow releases authorized by the Record of Decision will have the ability to improve these situations, but with a cap of 11,000 cfs for restoration flows, it will take time. The river channels and fish habitats need a jump-start.

TRRP Rehabilitation Sites

Restoration and Rehabilitation – what’s the difference?
A range of precise definitions can be found. As used by TRRP, restoration is the goal of returning greater ecological function to the post-dam river through multiple management actions. Whereas rehabilitation is the action taken to repair channel problems caused by post-dam flows and accelerate development of ecosystem function.

The second element of the Program’s restoration strategy directs the creation of a dynamic alluvial channel exhibiting characteristics of the pre-dam river, but at a smaller scale. This rehabilitation of channel form is intended to work with flows over time to restore the river and its fisheries. This combination of channel rehabilitation and river flow is expected to promote alternate bar sequences and low-velocity habitat for salmonid fry; increase habitat complexity; and allow the river to maintain itself as an alluvial system in both treated and untreated areas.  (Our Sven Olbertson page has a nice slideshow demonstrating the construction and the evolution of the site afterward.)

dsc6434logjam The ROD calls for 47 channel rehabilitation projects in the upper 40 miles of river below Lewiston Dam. Through adaptive management and monitoring, projects now include construction of natural riverine features such as floodplains, point bars, forced meanders, mid-channel islands, side channels, and alcoves. These more complex designs have increased the overall costs and extended the schedule for bank rehabilitation beyond what was described in the Flow Study.